



By DWV Construction · November 2026
Taking out a wall in Portland: the permit, the beam and the engineer
Whether a wall can come out depends on what it carries. This page covers how that is settled, what the city asks for, and what else is usually inside the wall.
Talk to Don about your projectHe comes out and prices it himself- Oregon CCB
- #208048
- Washington L&I
- #DWVCOCL754OW
- Coverage
- General liability insurance
- Established
- 2008
What decides the job.
Four things set the scope before any price is given: what the wall holds up, what replaces it, what runs through it and how old the house is.

What the wall carries
A wall either holds up the floor or roof above it, or it only divides two rooms. A wall that runs across the floor joists, sits over a beam or another wall, or stands near the middle of an older house is treated as bearing until someone has looked at the framing. The site walk tells which kind of wall it is, usually from the basement.

The beam that replaces it
A bearing wall comes out over a beam, with posts that carry the load down to the foundation. Portland asks for an engineer's calculations for any beam over ten feet long or any beam that supports a point load. DWV coordinates the engineer and carries the application.

What runs through it
Wiring, plumbing, heating ducts and gas lines often run inside a wall and have to be rerouted. In Portland changed wiring needs an electrical permit even when no building permit is required, and moved pipes need a plumbing permit. The licensed electrician and plumber on the job file those.

The age of the house
A house built before 2004 needs an asbestos survey by an accredited inspector before it is renovated. A house built before 1978 is presumed to have lead paint, and work that disturbs it follows the state's lead rules. DWV holds the Oregon lead-based paint renovation license the state requires to bid and work on those houses.
Read the older house guideFour 100 year old rooms, one open space.
“DWV is a small company that is able to create magnificent living spaces. Don Vedaa is a fine contractor and is on the job site daily. In larger companies the principal may not show up regularly. We felt it was essential that he oversee all aspects of the job, and assess the work of his subs. We converted four 100 year old rooms in an old part of our house to a much more commodious, welcoming, and useful open space, that allows for more cohesive sightlines, traffic flow, and HVAC circulation. They now blend seamlessly with a newer section of the house, without losing the sense of a vintage domicile. We were very happy with Don's work and most of his subs are seasoned pros. When errors or oversights were identified they were corrected quickly. While the timeline got a bit stretched out of shape, it was through no fault of DWV. We strongly recommend DWV for small to midsized domestic or business remodels, rebuilds, or new structures.”
Arthur OllmanGoogle reviewCommon questions.
If the wall carries load, yes, a building permit. If it carries nothing, the two rulebooks differ. The state code exempts a partition that carries no load and creates no living space. Portland's own guide still lists moving or removing any wall as work that needs a permit. A call to the city before the wall comes out settles it: 503-823-7300 on weekdays.

From the framing, and not from the wall itself. A wall that runs across the floor joists, sits over a beam or another wall below, or stands near the middle of an older house is treated as bearing until the framing has been looked at. The site walk tells which kind of wall it is, usually from the basement.
Often, when the wall carries load. Portland asks for calculations for any beam over ten feet long or any beam that supports a point load, and a design outside the code's standard tables needs a design professional licensed in Oregon. DWV coordinates the engineer and carries the application.
They are rerouted as part of the job. Changed wiring needs an electrical permit in Portland even when no building permit is required, and moved pipes need a plumbing permit. The licensed electrician and plumber file those.
Yes. A house built before 2004 needs an asbestos survey by an accredited inspector before it is renovated. A house built before 1978 is presumed to have lead paint, and DWV holds the Oregon license required to work on those houses.
It depends on what the wall carries. The price is made of the beam and its posts, the engineering and the permit, whatever has to be rerouted inside the wall, and the floor and ceiling where the wall stood. Don prices it line by line after he has seen the framing.
Usually. The rooms being worked on are sealed off with dust control walls, the same as on a kitchen job.
The state code is the same everywhere in Oregon. The permit office is not. Milwaukie, Lake Oswego and Happy Valley issue their own building permits, and Clackamas County issues them for Gladstone and the unincorporated areas.
Where the rules on this page come from
- City of Portland: do you need a permit for your home project
- City of Portland: structural design requirements for one and two family houses
- City of Portland: residential electrical permits
- City of Portland: residential plumbing permits
- Oregon Building Codes Division: the 2026 Oregon Residential Specialty Code
- Oregon DEQ: asbestos program
- Clackamas County: which office issues the building permit
Read November 2026. Rules change, and the office that issues your permit has the last word.
Talk directly to Don about your project.
Or pick a time for Don's site walk

“We chose Don because I truly feel like Don has the best communication out of all of the contractors that we've worked with, or have even met with.”
Kevin Howells · Google review
