ADUs and basement conversions in Portland: size limits, permits and cost

In Portland an ADU can be up to 800 square feet, and some lots can have two. Whether your lot can carry one is the first thing to find out.

Talk to Don about your projectHe comes out and prices it himself
5.032 Google reviews
Oregon CCB
#208048
Washington L&I
#DWVCOCL7540W
Coverage
Bonded and insured
Established
2008

Four ways to add a unit.

Each one has different rules, and which fits depends on the lot and the house that is already on it.

Finished white detached ADU

A detached ADU

A small house of its own in the yard, on a new foundation. In the Portland area a detached ADU typically runs $200,000 to $400,000, depending on its size, the finish level and what the site needs for utilities, grading and foundation.

Garage conversion shell framed on its slab

A garage conversion

An existing detached garage can become a legal dwelling. The shell is the starting point, and the plumbing, insulation and finishes are built inside it.

Attic conversion with a vaulted ceiling and a dormer door

An attic or a basement

Converting space the house already has adds living area without a new footprint. In Portland the 800 square foot limit does not apply to an ADU in the basement of a house that is at least five years old.

ADU roof framing open to the sky

An ADU attached to the house

An attached ADU is an addition to the main house. It gets its own foundation and framing, and its roof ties into the roof that is already there.

ADU roof framing going up

How big can your ADU be?

Portland allows 75 percent of the living area of the main house or 800 square feet, whichever is smaller.

1,600 sq ft

The largest ADU the size rule allows

800 square feet

Your house is large enough that the 800 square foot cap is the limit. Setbacks, lot coverage and height decide whether it fits on the lot.

Ask Don to check the lot

How an ADU gets built.

We run design, permits and construction as one job, from the lot check to the certificate of occupancy.

White detached ADU seen from the yard

The lot gets checked first

Before any design is paid for, we check what the lot can carry: setbacks, lot coverage, the height limit, the sewer lateral and parking. You get the answer in writing.

New concrete stem walls with the anchor bolts set

Drawings, permit, then the work underground

We prepare the architectural and structural drawings, file the permit package and answer the city's corrections. Then comes the part nobody sees: excavation, the foundation, separate sewer and water lines where the city requires them, and the trench for the electrical meter.

Common questions.

  • Up to 75 percent of the living area of the main house or 800 square feet, whichever is smaller. A 1,000 square foot house allows a 750 square foot ADU, and a 2,500 square foot house is capped at 800. The 800 limit does not apply to an ADU in the basement of a house that is at least five years old.

    White detached ADU from the yard

Talk directly to Don about your project.