DWV Construction
Green tile bath with the glass shower and the soaking tub beyond
White subway tile shower with a curbless entry
Dark tile shower with a teak floor
Finished white detached ADU

By Don Vedaa · Updated November 2026

Aging in place in Portland: a curbless bath and a main floor suite

Two rooms decide whether you can stay in your house as you get older: a bathroom you can walk into and a bedroom you do not climb stairs to reach.

Talk to Don about your projectHe comes out and prices it himself
5.032 Google reviews
Oregon CCB
#208048
Washington L&I
#DWVCOCL7540W
Coverage
Bonded and insured
Established
2008
Green tile shower with no curb at the entry

What would let you stay in the house?

Tick what you need. It sorts into the jobs it takes, with how long each one runs.

That is one job

A bathroom remodel

A hall bath takes three to four weeks and a primary bath four to six. Full bathrooms run from about $20,000 to $50,000. Everything you ticked for the bathroom is built in before the tile.

Send this list to Don

A bathroom you can walk into.

The details that make a bathroom safe later are built in before the tile.

Hex tile walk in shower with a sliding glass door

A walk in shower where the tub was

When a tub the household never uses comes out, a tiled walk in shower goes in its place, with a new pan, waterproofing, a tile surround and glass.

White subway tile shower with a curbless entry

No curb at the entry

A curbless shower has no step to lift a foot over. This one is in the Foster-Powell bungalow, a house built before 1920.

See the Foster-Powell bungalow
Marble shower with a niche and a bench

Grab bar blocking goes in at rough in

Grab bars need solid blocking inside the wall. It goes in at rough in, before the waterproofing and the tile, along with lever fixtures and the curbless entry.

Green tile bath with the glass shower and the soaking tub beyond

A primary bath rebuilt in Bethany

This late 1990s house got its primary bath rebuilt with a curbless shower, a freestanding tub and a double vanity, as part of a whole home remodel.

See the Bethany home

A bedroom and bath on the main floor.

When the bedrooms are upstairs, a suite can be added to the main level, or a small house can go in the yard.

Subway tile shower and tub in the Creston-Kenilworth bungalow

A suite added on the main level

The 1924 Creston-Kenilworth bungalow took a rear addition that extended the main level and added a primary suite, a bedroom and bath on the ground floor. From the street the house looks the same.

See the Creston-Kenilworth bungalow
Finished white detached ADU

A small house for family on the same lot

An ADU puts a parent or grown children a few steps away in a home of their own. We check what the lot can carry before any design is paid for.

Read the ADU guide

Common questions.

  • Yes. When a tub comes out we build a tiled walk in shower in its place, with a new pan, waterproofing, a tile surround and glass. It is a bathroom job and priced like one. We do not install conversion kits.

    Marble walk in shower with matte black fixtures

Talk directly to Don about your project.

Or pick a time for Don's site walk

★★★★★
“DWV Construction is a top-notch local contractor, whether you need a bathroom update or a full home remodel.”
Eleni Gerding · Google review