What a bathroom remodel costs in Portland in 2026

Most full bathrooms we build run from about $20,000 to $50,000. Three things decide where one lands in that range: the plumbing that moves, the tile and the glass. This page goes through them, with what Oregon requires a permit for.

Talk to Don about your projectHe comes out and prices it himself
5.032 Google reviews
Oregon CCB
#208048
Washington L&I
#DWVCOCL754OW
Coverage
General liability insurance
Established
2008

What moves the price.

The range is wide because bathrooms differ in what moves, what is tiled and what is behind the walls. Each is priced as its own line after the site walk.

Oak vanity with a round mirror over a marble floor

The plumbing that moves

A toilet, a shower or a vanity that stays where it is keeps its drain and its supply lines. Moving one means opening the floor or the wall, and Oregon requires a plumbing permit once piping inside a wall or under a floor is altered. Each move is its own line in the price.

See which permits a bathroom needs, and who issues them
Shower walls and floor wrapped in waterproofing membrane before the tile

The shower and its tile

A tiled shower is built from the pan up: a new pan, waterproofing behind the tile, the tile surround and the glass. When a tub comes out, that is what goes in its place. DWV does not install conversion kits.

Hex tile walk in shower with a sliding glass door

The glass

Custom frameless glass is measured once the tile is up and takes one to two weeks to make. It is one of the three things the price turns on.

A kitchen wall opened with insulation and wiring exposed

What is behind the walls

What a bathroom's walls hold follows the year the house was built. Oregon requires an asbestos survey before a house from before 2004 is renovated. Paint from before 1978 is handled as lead paint. Both go into the price before demolition.

See what a house of your year has behind its walls

A leaking toilet started it. It finished ahead of schedule and on budget.

“We’d been considering a full gut remodel of our kitchen and primary bathroom since moving into our home several years ago. The unknown scope and cost of such a project seemed to keep this idea slightly out of reach. A leaking toilet was our springboard to begin calling contractors for a bid. At this point we were still unsure if we would move forward with a simple toilet replacement/repair or pursue our dream of a full kitchen and bathroom remodel. We did our due diligence and met with several contractors. When we met Don and shared our vision for the project, it was clear to us we would be choosing DWV Construction for our project.

After our consult, Don took our ideas and transformed them into layout and design. He walked us through each step of the planning process including meeting us at various supply distributors to ensure our selections best fit the spaces. Don gave an estimate of 8 weeks from demo to finishing touches.

Don was always present at each phase of our project and gave clear direction to his subcontractors. Everyone who worked on our project were very professional, polite and skilled. We chose to continue living in our home during the project which comes with certain expectations, Don made this as comfortable as possible and was very respectful of our family time.

We were fortunate not to have any major surprises along our journey, however each time the unexpected happened, Don and his team corrected course without any undue stress. In the end our project was completed ahead of schedule, on budget and we are completely pleased with the result.

We fully recommend DWV Construction for your home projects. We look forward to working with Don again in the future!”

Craig CotugnoGoogle review

A hall bath and a primary bath.

The two jobs differ mostly in how long they run.

White subway tile shower with a curbless entry

A hall bath: three to four weeks

The shorter of the two jobs. Tile and glass are the variables, and the glass is ordered once the tile is on the wall.

Green tile primary bath with the vanity beside the glass shower

A primary bath: four to six weeks

One family had weighed a full remodel of their kitchen and primary bath for years, and a leaking toilet was what made them start calling contractors. Don estimated eight weeks from demolition to the finishing touches for both rooms. They wrote that it finished ahead of schedule and on budget.

Common questions.

  • A full bathroom built by DWV usually lands between $20,000 and $50,000. The tile, any plumbing that moves and the glass decide where in that range. Don gives the figure for yours after walking it with you, with every line priced.

    Marble shower behind frameless glass

Where the rules on this page come from

Read November 2026. Rules change, and the office that issues your permit has the last word.