What a bathroom remodel costs in Portland in 2026
Most full bathrooms we build run from about $20,000 to $50,000. Three things decide where one lands in that range: the plumbing that moves, the tile and the glass. This page goes through them, with what Oregon requires a permit for.
Talk to Don about your projectHe comes out and prices it himself- Oregon CCB
- #208048
- Washington L&I
- #DWVCOCL754OW
- Coverage
- General liability insurance
- Established
- 2008
What moves the price.
The range is wide because bathrooms differ in what moves, what is tiled and what is behind the walls. Each is priced as its own line after the site walk.

The plumbing that moves
A toilet, a shower or a vanity that stays where it is keeps its drain and its supply lines. Moving one means opening the floor or the wall, and Oregon requires a plumbing permit once piping inside a wall or under a floor is altered. Each move is its own line in the price.
See which permits a bathroom needs, and who issues them
The shower and its tile
A tiled shower is built from the pan up: a new pan, waterproofing behind the tile, the tile surround and the glass. When a tub comes out, that is what goes in its place. DWV does not install conversion kits.

The glass
Custom frameless glass is measured once the tile is up and takes one to two weeks to make. It is one of the three things the price turns on.

What is behind the walls
What a bathroom's walls hold follows the year the house was built. Oregon requires an asbestos survey before a house from before 2004 is renovated. Paint from before 1978 is handled as lead paint. Both go into the price before demolition.
See what a house of your year has behind its wallsA leaking toilet started it. It finished ahead of schedule and on budget.
“We’d been considering a full gut remodel of our kitchen and primary bathroom since moving into our home several years ago. The unknown scope and cost of such a project seemed to keep this idea slightly out of reach. A leaking toilet was our springboard to begin calling contractors for a bid. At this point we were still unsure if we would move forward with a simple toilet replacement/repair or pursue our dream of a full kitchen and bathroom remodel. We did our due diligence and met with several contractors. When we met Don and shared our vision for the project, it was clear to us we would be choosing DWV Construction for our project.
After our consult, Don took our ideas and transformed them into layout and design. He walked us through each step of the planning process including meeting us at various supply distributors to ensure our selections best fit the spaces. Don gave an estimate of 8 weeks from demo to finishing touches.
Don was always present at each phase of our project and gave clear direction to his subcontractors. Everyone who worked on our project were very professional, polite and skilled. We chose to continue living in our home during the project which comes with certain expectations, Don made this as comfortable as possible and was very respectful of our family time.
We were fortunate not to have any major surprises along our journey, however each time the unexpected happened, Don and his team corrected course without any undue stress. In the end our project was completed ahead of schedule, on budget and we are completely pleased with the result.
We fully recommend DWV Construction for your home projects. We look forward to working with Don again in the future!”
Craig CotugnoGoogle reviewA hall bath and a primary bath.
The two jobs differ mostly in how long they run.

A hall bath: three to four weeks
The shorter of the two jobs. Tile and glass are the variables, and the glass is ordered once the tile is on the wall.

A primary bath: four to six weeks
One family had weighed a full remodel of their kitchen and primary bath for years, and a leaking toilet was what made them start calling contractors. Don estimated eight weeks from demolition to the finishing touches for both rooms. They wrote that it finished ahead of schedule and on budget.
Common questions.
A full bathroom built by DWV usually lands between $20,000 and $50,000. The tile, any plumbing that moves and the glass decide where in that range. Don gives the figure for yours after walking it with you, with every line priced.

It is a shorter one. A hall bath takes three to four weeks and a primary bath four to six. Each is priced by what goes into it, line by line, not by the name of the room.
No. Oregon requires no permit to repair or replace a sink, a toilet or a faucet that is not concealed in a wall, or to regrout tile. A plumbing permit is required once piping inside a wall or under the floor is altered, or a fixture is relocated.
Yes, a mechanical permit. Oregon lists installing a bath fan among the work that needs one. New or altered wiring for it takes an electrical permit, which the licensed electrician files.
Yes, as a built shower. The tub comes out and a tiled walk in shower goes in, on a new pan, with waterproofing behind the tile and glass in front. DWV does not install conversion kits.
Three to four weeks for a hall bath and four to six for a primary bath. Where the house has one bathroom, the fixtures stay usable overnight wherever the plumbing allows.
Only by a change you sign. A change is written up with its own price and its effect on the schedule before the work on it starts. One homeowner whose kitchen and primary bath were rebuilt together wrote that the pricing remained constant throughout the entire remodel.
Yes, and two homeowners who did both have written about it. One was given an estimate of eight weeks and wrote that the work finished ahead of schedule. The other, working with a designer, wrote that construction lasted four months, roughly in line with the first estimates.
Where the rules on this page come from
- Oregon Building Codes Division: about Oregon residential building permits
- City of Portland: do you need a permit for your home project
- Oregon DEQ: asbestos program
Read November 2026. Rules change, and the office that issues your permit has the last word.
Talk directly to Don about your project.
Or pick a time for Don's site walk

“Don provided clear and transparent pricing that remained constant throughout the entire remodel.”