



Remodeling a house in Westlake
Kitchen, bath and whole home remodels in Westlake, a planned Lake Oswego neighborhood with its own covenants.
Talk to Don about your projectHe comes out and prices it himself- Oregon CCB
- #208048
- Washington L&I
- #DWVCOCL7540W
- Coverage
- Bonded and insured
- Established
- 2008

Kruse farmland, then a 300 acre planned development.
The Kruse family farmed this land from the 1860s, and it stayed mostly farmland for almost a century. Interstate 5 was finished in 1966 and Kruse Way was built about a decade later, linking the freeway to Boones Ferry Road.
Westlake was then built as a 300 acre planned unit development designed by the Lake Oswego engineering firm OTAK, with the twelve acre Westlake Park and forty five acres of open space set aside. It mixes single family and multi family housing and has more than one thousand households.




What is behind the walls of your house.
The age of the house moves the price more than anything you can see. This is what is typical for a Portland house of that age. The site walk confirms what yours has.
1 of 8 are likely on a 1990 house.
Knob and tube or early cloth wrapped wiring is common in houses of this age, and it is live in more rooms than the panel suggests.
Electrical service and panel: $2,000 to $12,000
What DWV does: Full electrical replacement with a service upgrade, as on the Foster-Powell bungalow.
Ask Don about thisGalvanized steel supply lines narrow with age. On the Foster-Powell bungalow they were replaced from the meter through every fixture.
Part of the electrical, plumbing and heating line
What DWV does: New plumbing from the meter through every fixture.
Ask Don about thisThe waste lines in these houses are often the original cast iron, out of sight under the floors.
Part of the electrical, plumbing and heating line
What DWV does: Replaced with the plumbing where they have failed.
Ask Don about thisBrick chimneys of this age are unreinforced masonry, which matters as soon as the structure around them changes.
Priced on the estimate after the site walk
What DWV does: Looked at with the structure before any wall around it moves.
Ask Don about thisThe walls are usually uninsulated and the windows are single pane wood. Insulation comes up to energy code once the walls are open.
Part of the structure and envelope line
What DWV does: Insulation to current energy code while the walls are open.
Ask Don about thisMany of these houses were first heated with oil, and the tank can still be under the yard. A tank taken out of use is decommissioned by a DEQ licensed service provider.
What is behind the walls: $8,000 to $60,000
What DWV does: Decommissioned by a DEQ licensed service provider.
Ask Don about thisPaint applied before 1978 is treated as lead paint under the renovation rule, and work that disturbs it follows lead safe practices.
A line item, priced before demolition
What DWV does: Lead safe practices, priced before demolition.
Ask Don about thisOregon DEQ requires a survey by an accredited inspector before a house built before 2004 is renovated. Older duct wrap and sheet flooring get tested before anything is disturbed.
A line item, priced before demolition
What DWV does: Surveyed first, then handled the way the survey says.
Ask Don about this
Same spot, before and after.
Before
AfterA pool that had turned green, brought back with new tile, a stamped concrete deck and a cedar fence.
See the project
A pool, fencing, concrete and electrical on one job.
“I recently had the good fortune of having DWV Construction recommended to me for a renovation of a pool and several related projects including fencing, landscape, electrical work, concrete deck replacement, along with other miscellaneous tasks. Everything was completed beyond my expectations and I am thrilled with the results! Don is very observant, helpful, knowledgable, professional and kind. I am very grateful for all he has done!”
Patricia SiegelGoogle reviewThe work Westlake houses ask for.
The photographs are from our own jobs around Portland.

Kitchens
The room under construction is sealed off with dust control walls, and a temporary kitchen goes in at the start. Most full kitchens take six to ten weeks.

Bathrooms
Tile, plumbing moves and glass decide where a bathroom lands between about $20,000 and $50,000.

Additions and exterior changes
The Westlake Homeowner's Association has its own covenants and restrictions on top of the city's rules. Both are read before an exterior change is drawn.

Primary baths
Stone is picked in person at the slab yard with Don. Custom frameless glass takes one to two weeks to make.

Lake Oswego permits, plus the homeowners association.
Building permits come from the City of Lake Oswego Building Department. The city listed first review of residential structure permits at two to three weeks as of July 2026.
Westlake's homeowners association has its own covenants on top of city rules. The Lake Oswego Preservation Society notes they go as far as requiring a doghouse to match the materials of the house.
Removing any tree with a trunk six inches or more across needs a city tree removal permit, and the city asks owners to contact Planning before starting an exterior remodel.
Check which permits your job needsOur jobs near Westlake.
Our closest job is the deck over a garage in Southwest Portland. Tap a pin to see the job.

SW Portland
A leaking deck over the garage, rebuilt with new cedar siding.
See this jobNext door: Lake Oswego, Lake Grove, Tigard
Questions from Westlake homeowners.
Westlake's homeowners association has its own covenants and restrictions on top of city rules. Read them before any exterior change is drawn.

The city's Building page listed residential structure permits at two to three weeks for first review as of July 2026.
Yes, if the trunk is six inches or more across at breast height. Pruning is fine without one. Topping a tree counts as removing it.
Paint is treated as lead paint only when it was applied before 1978. Oregon requires an asbestos survey before a house built before 2004 is renovated, so it depends on the year yours was built.
Talk directly to Don about your project.
Or pick a time for Don's site walk

“In the end our project was completed ahead of schedule, on budget and we are completely pleased with the result.”
Craig Cotugno · Google review
