Remodeling a house in Westlake

Kitchen, bath and whole home remodels in Westlake, a planned Lake Oswego neighborhood with its own covenants.

Talk to Don about your projectHe comes out and prices it himself
5.032 Google reviews
Oregon CCB
#208048
Washington L&I
#DWVCOCL7540W
Coverage
Bonded and insured
Established
2008
Farmhouse kitchen with French doors to the yard

Kruse farmland, then a 300 acre planned development.

The Kruse family farmed this land from the 1860s, and it stayed mostly farmland for almost a century. Interstate 5 was finished in 1966 and Kruse Way was built about a decade later, linking the freeway to Boones Ferry Road.

Westlake was then built as a 300 acre planned unit development designed by the Lake Oswego engineering firm OTAK, with the twelve acre Westlake Park and forty five acres of open space set aside. It mixes single family and multi family housing and has more than one thousand households.

The front of a house stripped to the sheathing with water damage showing
SW Portland, stripped to the sheathing
A kitchen wall opened with insulation and wiring exposed
Walls opened on a kitchen job
A kitchen stripped to the framing with the subfloor exposed
Down to the framing
A slate tile deck over a garage before the work
The leaking deck before the work

What is behind the walls of your house.

The age of the house moves the price more than anything you can see. This is what is typical for a Portland house of that age. The site walk confirms what yours has.

1990

1 of 8 are likely on a 1990 house.

  • Knob and tube or early cloth wrapped wiring is common in houses of this age, and it is live in more rooms than the panel suggests.

    Electrical service and panel: $2,000 to $12,000

    What DWV does: Full electrical replacement with a service upgrade, as on the Foster-Powell bungalow.

    Ask Don about this

Same spot, before and after.

The pool before, green water and a cracked deckBefore
The finished pool with new tile, a stamped concrete deck and a cedar fenceAfter

A pool that had turned green, brought back with new tile, a stamped concrete deck and a cedar fence.

See the project
New lawn and cedar fence beside the finished pool, from the homeowner's own photo

A pool, fencing, concrete and electrical on one job.

“I recently had the good fortune of having DWV Construction recommended to me for a renovation of a pool and several related projects including fencing, landscape, electrical work, concrete deck replacement, along with other miscellaneous tasks. Everything was completed beyond my expectations and I am thrilled with the results! Don is very observant, helpful, knowledgable, professional and kind. I am very grateful for all he has done!”

Patricia SiegelGoogle review

The work Westlake houses ask for.

The photographs are from our own jobs around Portland.

White kitchen with a stainless range wall

Kitchens

The room under construction is sealed off with dust control walls, and a temporary kitchen goes in at the start. Most full kitchens take six to ten weeks.

Green tile bath with the glass shower and the soaking tub beyond

Bathrooms

Tile, plumbing moves and glass decide where a bathroom lands between about $20,000 and $50,000.

New roof framing open to the sky

Additions and exterior changes

The Westlake Homeowner's Association has its own covenants and restrictions on top of the city's rules. Both are read before an exterior change is drawn.

Dark tile shower with a teak floor

Primary baths

Stone is picked in person at the slab yard with Don. Custom frameless glass takes one to two weeks to make.

Design rendering of a renovated pool with a cedar fence and a rock waterfall

Lake Oswego permits, plus the homeowners association.

Building permits come from the City of Lake Oswego Building Department. The city listed first review of residential structure permits at two to three weeks as of July 2026.

Westlake's homeowners association has its own covenants on top of city rules. The Lake Oswego Preservation Society notes they go as far as requiring a doghouse to match the materials of the house.

Removing any tree with a trunk six inches or more across needs a city tree removal permit, and the city asks owners to contact Planning before starting an exterior remodel.

Check which permits your job needs

Our jobs near Westlake.

Our closest job is the deck over a garage in Southwest Portland. Tap a pin to see the job.

The finished SW Portland deck and house

SW Portland

A leaking deck over the garage, rebuilt with new cedar siding.

See this job

Next door: Lake Oswego, Lake Grove, Tigard

Questions from Westlake homeowners.

  • Westlake's homeowners association has its own covenants and restrictions on top of city rules. Read them before any exterior change is drawn.

    U shaped kitchen with wood cabinets

Talk directly to Don about your project.

Or pick a time for Don's site walk

★★★★★
“In the end our project was completed ahead of schedule, on budget and we are completely pleased with the result.”
Craig Cotugno · Google review